Because most offices stay open, sequence is as important as the product. Furniture moves, cabling, and occupancy all compete for the same days, so the work is phased by area or by floor, with containment for dust, protection for adjacent finishes, and noisy preparation scheduled outside business hours where the building allows it. Elevator and loading access are planned in advance, because a crew that cannot move material on time loses the day.
Substrate work is handled by our own crews, not subcontracted: demolition, adhesive removal, diamond grinding and shot blasting, crack and joint repair, patching, and moisture mitigation where the test results call for it. Where the project is publicly funded, union certified crews, DIR registration, certified payroll, and prevailing wage are handled as part of the job. Estimates are free, and the work is installed across the Bay Area and the Sacramento corridor.