Multi-family work runs on turnover schedules and resident access. Units are phased as they come vacant, or worked in blocks so residents can be relocated and returned on a known date. Common areas run on a different clock, phased so a corridor stays usable and access to stairs, mail, and elevators is never blocked. Dust is contained, work is scheduled with the property manager, and daily progress is communicated so leasing is not surprised.
Substrate work stays in house. Demolition, adhesive removal, diamond grinding or shot blasting, crack and joint repair, patching, moisture vapor testing, and mitigation are performed by our own crews, which keeps a repeatable standard across every unit rather than a different subcontractor on each floor. On publicly funded work, union certified crews, DIR registration, certified payroll, and prevailing wage are handled as part of the job. Estimates are free, and the work is installed across the Bay Area and the Sacramento corridor.