We start with an assessment of the current floor covering, the adhesive, the substrate condition, moisture vapor emission, pH, and the access the building can provide. Demolition and adhesive removal, diamond grinding or shot blasting, crack and joint repair, patching, and moisture mitigation are performed by our own crews. Layout follows, including pattern and grout lines, transitions, and the sequence that keeps one wing open while another is closed.
Schedules and compliance run alongside. We phase work by area, contain dust, and work outside operating hours when a room has to be back in service quickly. On public work, union certified crews, DIR registration, certified payroll, and prevailing wage are handled as part of the job. Estimates are free, and the work is installed across the Bay Area and the Sacramento corridor.